Click to Home
Go To Search
PrintEmail Page

Columbus News

5 Stories
Posted on: July 15, 2014

Restart of NDOR Highways 30 and 81 Reconstruction Project

Construction work is scheduled to resume on 33rd Avenue and 23rd Street on July 16th.

The 33rd Avenue segment between the Platte River bridge to near 5th Street will be daytime hours with milling operations to end July 18th. Milled roadways will be rough through the weekend. Asphalt overlay construction is... Read on...

Posted on: July 15, 2014

Public Library Alternate Entrance

Beginning Monday, July 21st visitors to the Columbus Public Library will be required to use an alternate entrance due to repair work around the front entryway.

The comprehensive work needed to repair leaks around the library's front entrance could take up to six weeks.

The temporary entrance will be through a north-facing door which opens in the alley running east and west... Read on...

Alternate Entrance Diagram
Posted on: May 29, 2014

Consumer Confidence Report 2013

The City of Columbus Water Production Division announced that the Annual Consumer Confidence Report on 2013 water quality will be available to every residence and business that currently pays for water.

The URL (www.columbusne.us/cr) regarding annual water quality report will be included on the June 2014 utility bills and on the City of Columbus web site. Any resident or... Read on...

Additional Info...
Posted on: May 12, 2014

Construction Continues In Columbus

Weather permitting, night time work on the Highway 30/81 project is scheduled to begin the evening of May 15th from the intersections of 33rd Ave. and 15th St. extending north to the 33rd Ave. and 23rd St. intersection.

Improvements on this portion of the project will consist of repairing the underlying concrete pavement, milling the surface of the existing roadway and resurfacing with asphalt. Sidewalk curb ramps from 15th St. to 21st St.... Read on...

Construction Map
Posted on: March 27, 2014

Highway US-81/US-30 Resurfacing

Work is scheduled to begin the week of April 7th on Highway US-81/US-30 in and south of Columbus.

The project will begin at the north end of the Platte River Bridge and extend north to just south of the 33rd Avenue and 6th Street intersection. Improvements will consist of repairing the underlying concrete pavement,... Read on...

Construction Map