Speece Lewis Engineers, Inc. and KEA Construction LLC wish to inform you that the Christopher Cove Bridge will be closed on Tuesday, September 17, 2013, from 9 a.m. to 3 p.m. to all vehicle traffic.
The bridge will be open to pedestrians. The purpose for this closure is for bridge concrete panel repair and a final inspection.